Monday, 16 January 2012

After studying the plans we received from our client it was clear that there was scope to   maximize and improve the use of available floor area. On the ground floor we made adjustments to the west wing which allowed us to better proportion the guest bedroom and also allowed the inclusion of an en-suite. On the first floor we extended the layout into the previously redundant roof voids to give an extra room and improve the proportion of the remaining rooms.